Your GovernmentCity ServicesOur CommunityDoing BusinessHow Do I / Help Center
Click to Home

Go To Search
HomePrintEmail
Alerts
 


Translate
Wastewater Treatment & Sewer Collection
Concord General Services Wastewater Treatment Division and Highway and Utilities Division provide services for the collection and treatment of wastewater for Concord and portions of Bow and Boscawen. The wastewater collection system contains 163 miles of sanitary sewer line and 8 pump stations throughout Concord. Two wastewater treatment facilities treat the City’s wastewater.

Report A Concern
Use our request tracker to report a concern about the sewer or wastewater odor.


Hall Street Wastewater Treatment Plant
Wastewater Treatment Plant Hall Street
The main wastewater treatment plant is located at 125 Hall Street in Concord. The facility was built in 1979 and provides wastewater treatment for Concord and portions of Bow. The plant was designed for a capacity of 10.1 million gallons per day and a peak flow capacity of 25.0 million gallons. The plant is currently treating an average of 4 million gallons of wastewater per day. The facility also treats various off-site waste streams, including approximately 5 million gallons of landfill leachate per year and 2 million gallons of domestic septage from local communities. The plant process generates approximately 7,500 wet tons of biosolids annually that are transported off-site to be used as fertilizer or as a component of manufactured topsoil. The plant occupies approximately 28 acres of land, although the City of Concord owns an additional 75 acres around the plant that consists of wooded areas and farm land.


Penacook Wastewater Treatment Plant
Penacook Wastewater Treatment Plant
The Penacook Wastewater Treatment Plant is located at 7 Penacook Street in Penacook. The plant was originally built in 1973 to treat a significant industrial discharge from the former Allied Leather Tannery. After the tannery closed in 1987, the flow reduced. The plant was converted from a conventional activated sludge plant to a sequencing batch reactor (SBR) process in 2005 after flow conditions were below the capacity. The new SBR process has a treatment capacity of 1.2 million gallons of wastewater a day. The former primary clarifier and aeration tank is utilized for wastewater storage during periods of high flow, which occur primarily during the early spring of each year. This facility services the Penacook area of Concord and a portion of Boscawen. Concord is one of two communities (the other being Portsmouth) in New Hampshire that operate two wastewater treatment facilities. Read our feature in TPO Magazine for more information about our Penacook Wastewater Treatment Facility. 


Contact Us
Dan Driscoll
Wastewater Treatment Superintendent
Email 

125 Hall Street 
Concord, NH 03301

Administration Hours:
Monday - Friday 
7:00 a.m. - 3:30 p.m.

Phone: 603-225-8691
Fax:     603-230-3850

Calendar
Mon, Oct. 31 - Fri, Dec. 9

View All