Loading..
|
FY2008 Bids/Proposals |
|
|
The City's Fiscal Year runs from July 1st 2007 thru June 30th 2008
If you would like to receive a copy of any of the bids/proposals listed here please contact the Purchasing Division, City of Concord @ purchasing@concordnh.gov (603) 225-8530. Most of our bids and proposals are now available for download in acrobat format. Word format documents are available upon request. Most solicitations are available in electronic format (PDF) - click on the title of the bid or proposal that you would like to download.
If you are looking for a particular solicitation and do not find it on this web site or if you have any questions regarding any Bids or RFP's please contact the Purchasing Division at the above number.
|
If a vendor downloads a bid/RFP from this website, it is the vendors responsibility to periodically check this website for addenda prior to submittal of a bid/proposal. |
|
|
|
Bids and Proposals - Downloadable Versions in PDF Format - Word Formats are available upon request |
||||
|
Bid/Proposal Number: Title
Addenda |
Deadline Closing Date and Time |
Pre-bid meeting Date, Time and Location
|
Required |
Awarded to: |
|
RFP55-08
Dump Body and Plow Set-Up for a 10 Wheel Truck Chassis General Services Dept.- Equipment Services Division |
7/23/08 not later than 2:00pm | None | None |
Awarded: Howard Fairfield LLC: $59,471.00 |
|
RFP54-08 Class 8, 10 Wheel Dump Truck Cab and Chassis General Services Dept.- Equipment Services Division |
7/22/08 not later than 2:00pm | None | None |
Awarded: Liberty International Trucks of NH $85,193.19 |
|
B53-08
Remark Runways 17/35, 12/30 and Taxiway Alpha
General Services - Public Properties |
7/18/08 not later than 2:00pm | None | None |
Awarded: Markings, Inc. $34,875.00 |
|
B52-08 Liquid
Aluminum Sulfate General Services - Water Supply Division |
7/8/08 not later than 2:00pm | None | None |
Awarded: GAC Chemical, Corp. 7/1/08 - 12/31/08: $435.50/dry ton 1/1/09 - 12/31/09:$520.75/dry ton |
|
RFP51-08
Granular Activated Carbon for Taste and Odor Control Water Treatment
Plant General Services - Water Treatment Division |
8/15/08 not later than 2:00pm | A Non-Mandatory pre-proposal meeting shall be held on August 1st, 2008 at 10:00am at the Water Treatment Plant at 53 Hutchins Street, Concord NH 03301 | Each proposal in excess of $25,000 shall be required to submit a bid bond of 5% of the proposal price. | Awarded: Calgon Carbon Corporation $46,271.68 |
|
RFP50-08
Preservation Planning Services for the Historic Agricultural Resources
Survey
Community Development Dept- Planning Division |
July 1, 2008 not later than 2:00pm | None | None | Awarded: Ms. Elizabeth Durfee Hengen $24,200.00 |
|
B49-08
Reconstruction of Fisherville Road (US Route 3) From Bog Road to Borough
and Manor Roads
Plans and Specifications may be purchased from the Purchasing Division, City Hall, 41 Green Street, Concord NH 03301 (603) 225-8530 for a non-refundable fee of $200 per set plus a non-refundable fee of $30 per set should they need to be mailed. Community Dev- Engineering Services |
July 3, 2008 not later than 2:00pm | A Mandatory pre-bid informational meeting shall be held at 10:00am on Tuesday June 17th 2008 at the City of Concord, City Hall, 2nd Floor Conference Room, 41 Green Street Concord NH 03301 (603) 225-8530 | 10% Bid Bond Required |
Awarded: Continental Paving, Inc. $1,313,454.50
|
|
RFP48-08 Fuels Solicitation NH Energy Group Finance/Purchasing
|
6/17/08 not later than 12:00 PM | None | None |
Awarded: H R Clough, Inc. #2 Fuel Oil: $4.4851/ gal. Eastern Propane Propane: State of NH contract #195244 Selkirk, NY Principal average weekly posting + $.089/gal. D K Burke, Inc. Kerosene: JOC Boston Low + $.428/ gal. Gasoline 87 & 89 Octane: 50% of volume: $3.50/gal. 40% of volume: $3.18/gal. Balance: JOC Boston Low + $.0252/gal.(transport) $.313/gal. (tank wagon) ULSD - Premium 50% of volume: $4.10/gal. 40% of volume:$3.71/gal. Balance: JOC Portsmouth Low + $.0262/gal. (transport), $.313/ gal. (tank wagon) |
|
RFP47-08 Energy Solicitation - Natural Gas Finance/Purchasing |
5/15/08 not later than 12:00pm | None | None |
Awarded: Santa Buckley $1.22/ therm (supply only) |
|
B46-08 White Park
Improvement Project Engineering Services Division |
6/17/08 not later than 2:00pm
|
A Mandatory pre-bid informational meeting shall be held at 10:00am on Friday May 30, 2008 at the White Park Administration Building, 1st Floor Conference Room, 1 White Street, Concord NH 03301 | 10% Bid Bond Required |
Awarded:
Gordon Construction,Inc. $759,066.35 |
|
RFP45-08
Energy Solicitation - Electricity Finance/Purchasing |
5/30/08 not later than 2:00pm | None | None |
Awarded: Constellation New Energy: $.13535/kwh (G-1 Accounts Only)
|
|
RFP44-08 Forestry
Consultant Community Development Department - Planning Division - Forest Committee and Concord Conservation Commission |
7/8/08 not later than 2:00pm | None | None |
Awarded: Foreco, LLC $19,300.00 |
|
B43-08 Sidewalk Connection for Fisherville Road, Manor Road, Abbott Road
and Borough Road CDD-Engineering Plans and Specifications may be obtained at the City of Concord Purchasing Office, City Hall, 41 Green Street Concord NH 03301 (603) 225-8530 for a non-refundable fee of $75.00 per set plus a non-refundable fee of $20.00 per set if they are to be mailed.
|
5/8/08 Not later than 2:00pm
|
A Mandatory pre-bid meeting shall be held on April
24th at 11am in the City Council Chambers, 37 Green Street, Concord NH
03301. Roster included in Addendum 1 |
10% Bid Bond Required |
Awarded: J.G.C. Enterprises, Inc. $417,901.50 |
|
RFP42-08 Life Insurance and Short Term Disability Insurance Attachments 1-6 Life Claims Experience Summary Employee Census and Job Title Listing Current STD Insurance Policy Certificate Current Life Insurance Policy Certificate Flexible Benefits Booklet Exerp Personnel Dept.
|
4/22/08 not later than 2:00pm | None | None | Awarded: Primex |
|
RFP41-08 Everett Arena Pro Shop Concession Public Properties |
5/20/08 not later than 2:00pm | None | None |
Awarded: P & P Sporting Goods d/b/a Everett Sports Center $4500 Annual Fee No other proposals received
|
|
B39-08 2008 Water Main Cleaning and Lining Project Plans and specifications may be obtained from the Purchasing Division, City Hall, 41 Green Street, Concord NH 03301 (603) 225-8530 for a non-refundable fee of $75 per set plus a non-refundable fee of $20 if they are to be mailed per set. Community Development - Engineering Services |
7/17/08 not later than 2:00pm | A Mandatory pre-bid meeting will be held at 10:00am on July 9, 2008 at the City of Concord, City Hall Annex, 2nd Floor-City Council Chambers, 37 Green Street Concord NH 03301 | 10% Bid Bond Required |
Awarded: Heitkamp, Inc. $692,935.92 |
|
RFP38-08 City Hall Campus
Needs Assessment & Space Planning Study City Administration 2002 Dubois & King City Hall Annex Facility Assessment 2002 Dubois & King Green Street Community Center Assessment 2002 Dubois & King Police Station Facility Assessment |
6/27/08 not later than 2:00 pm
|
A non-mandatory information session will be held on
June 13, 2008 at 10:00 AM in City Hall, 2nd Floor Conference Room, 41
Green Street, Concord, NH. Sign in Sheet provided in Addendum 2 |
None |
Postponed for a future time ( 2012 or beyond) |
|
B37-08 Cold Plane - Overlay Project
General Services - Highway Division |
3/13/08 not later than 3:00pm | None | 10% Bid Bond Required |
Awarded:
Pike Industries $417,792.00 |
|
B36-08 Pavement Reclamation
General Services - Highway Division |
3/11/08 not later than 2:00pm | None | 10% Bid Bond Required | Awarded: Continental Paving $1,533,282.00 |
|
RFP35-08 Physical Exams and Medical Services Personnel Dept. |
3/20/08 not later than 2:00pm | None | None |
Awarded: Merrimack Valley Occupational Health
|
|
B34-08 2008 Water
Main Replacement Project Plans and Specifications may be obtained from the Purchasing Division, City Hall, 41 Green Street, Concord NH 03301 (603)-225-8530 for a non-refundable fee of $75.00 per set. If the plans and specifications must be mailed an additional non-refundable fee of $20.00 will be charged per set. Engineering Division |
4/16/08 not later than 2:00pm | A Mandatory pre-bid meeting shall be held on 4/1/08 at 9am at the City of Concord, City Hall Annex, 2nd Flr (City Council Chambers), 37 Green Street, Concord NH 03301 | 10% Bid Bond Required |
Awarded: FL Merrill Construction Inc.
$715,619.40
|
|
RFP33-08 Mobile Stage General Services - Fleet Division |
2/29/08 not later than 2:00pm | None | None |
All proposals rejected due to FY08 budgetary
constraints
|
|
RFP32-08 Insurance Program for the City - Property
and Liability Addendum 1 issued 3/10/08 Finance Dept. |
3/21/08 not later than 2:00pm | None | None |
Dual Award: LGC Property-Liability Trust LLC -
Concord, NH - Property & Liability Insurance $501,150.00 NH Public Risk Management Exchange DBA: Primex - Worker's Compensation $382,985.00 |
|
RFP31-08
Concord Municipal Airport request for Private Commercial Building
Development Proposals for City Owned Land Lease.
CDD |
6/10/08 not later than 2:00pm |
A Mandatory on-site pre-proposal meeting
and site walk at the New Hampshire Civil Air Patrol Offices at 51
Airport Road with Kenneth G. Lurvey, Business Development Coordinator at
10:00 A.M. on May 27, 2008.
|
None |
Pending: Proposal responses are held in confidence and will be released upon award. |
|
RFP30-08
Forestry Skid Units Fire Dept. |
2/22/08 not later than 2:00pm | None | None | Awarded: Lakes Region Fire Apparatus Inc. $22,950.00 |
|
RFP29-08
Dump Body and Plow Set-up for a 6-Wheel Class 8 Truck Chassis
General Services |
1/29/08 not later than 2:00pm | None | None | Awarded: Howard P. Fairfield LLC - Pembroke NH $51,521.00 |
|
RFP28-08 Sale of 3.43 Acre
Parcel as Part of Comprehensive Development Proposal - Loudon Road (NH
Rte 9) and Old Loudon Road Community Development |
3/14/08 not later than 2:00 pm | None | None |
Pending: Proposal responses are held in confidence and will be released upon award. |
|
RFP26-08 Health Insurance Benefits
Finance Dept. |
1/30/08 not later than 2:00pm | None | None | Awarded: Harvard Pilgrim Health Care |
|
RFP25-08 CFD
Roofing System Concord Fire Dept. |
4/30/08 not later than 2:00pm | A Mandatory pre-proposal meeting shall be held 4/16/08 at 9:00am at the Concord Fire Department Headquarters, 24 Horseshoe Pond Lane, Concord NH 03301. | 10% Proposal Bond Required |
Awarded: M C Contracting $130,700 |
|
RFP24-08 Laboratory Equipment Maintenance and Calibration Services Water Division |
1/23/08 not later than 2:00pm | None | None |
Awarded:
Q C Services - Harrison ME
|
|
RFP23-08
Horseback Riding Camp Recreation Dept. |
1/25/08 not later than 2:00pm | None | None |
Awarded: Gelinas Farm Inc. $375 Full Day Camps and
$175 Half Day Camps No other Proposals Received
|
|
RFP22-08
Youth Soccer Camp Services Recreation Dept. |
1/18/08 not later than 2:00pm | None | None | Awarded: Play Soccer - Marlborough MA |
|
RFP21-08
Replacement Windows/ Concord Fire Dept
Fire Department |
1/04/08 not later than 2:00PM | None | 5% Bid Bond Required |
Awarded:
Englewood Construction Co. Inc - Manchester
NH $42,163.00
|
|
B20-08 Centre, Liberty and Auburn Intersection Improvement Project
Plans and Specifications may be obtained from the City of Concord, Purchasing Division, 41 Green Street, Concord NH 03301 (603) 225-8530 for a non-refundable fee of $80.00 per set plus a non-refundable fee of $20 per set if they are to be mailed. CDD-Engineering
|
5/14/08 not later than 2:00pm
|
A Mandatory pre-bid informational meeting shall be
held on April 29th at 10:00am at City Hall, 2nd Floor Conference Room,
41 Green St. Concord NH. Roster included in Addendum 1 |
10% Bid Bond Required |
Awarded: Continental Paving, Inc. $403,995.00 |
|
B19-08
Hydrofluosilic Acid General Services |
12/14/07 not later than 2:00PM | None | None |
All Sales Rejected. Purchasing on the open market. |
|
RFP18-08 Sports Uniforms, T-Shirts, Polo/Golf Shirts and Sweatshirts
Fire Department |
2/28/08 not later than 2:00pm | None | None |
Multi Vendor Award:
Shirtmasters - Chichester, NH - Concord Fire Department Fruit of the Loom Bowling Green, KY- Recreation Dept. Teddy's Tees -Concord Police Department |
|
B17-08
Concord Municipal Airport Demolish Three Residential Buildings
CDD Bid Documents may be obtained for a non-refundable fee of $25 per set plus a non-refundable fee of $10 per set if they are to be mailed. |
2/15/08 not later than 2:00pm | A Mandatory pre-bid meeting shall be held at the City of Concord, City Hall, 2nd Floor Conference Room, 41 Green Street Concord NH 03301 at 9:00am on Feb 5, 2008 | 10% Bid Bond Required | Awarded: All-Ways Wrecking $43,500.00 |
|
B16-08 Penacook Wastewater Treatment Facility Roof
Repair Invitation to Bid
Addendum 1 issued 12/14/07 (includes mandatory sign in roster)
|
1/8/08 not later than 2:00PM |
A mandatory pre-bid meeting shall be held at the
Penacook Wastewater Treatment Facility, 7 Penacook Street on 12/5/07 at
10:00AM
|
10% Bid Bond Required | Awarded: MC Contracting Inc. $60,400.00 |
|
RFP 15-08 Vermeer SC802 Stump
Cutter
|
11/16/07 not later than 2:00 PM | None | None | Awarded to: NYNE Equipment, Inc. $43,942 |
|
RFP14-08 Class 8 Dump Truck
Cab and Chassis
|
11/9/07 not later than 2:00 PM | None | None | Awarded to: Liberty International Trucks of NH, LLC $193,142 |
| RFP13-08 Hall Street Wastewater Treatment Facility High Voltage Cable/Termination Upgrade | 11/14/07 not later than 2:00 PM | A mandatory pre-bid meeting shall be held at the Hall Street Wastewater Treatment Facility, 125 Hall Street on 11/2/07 at 9:00 AM. | 5% Bid Bond Required | Awarded: Utility Service Assistance Inc - Hooksett NH $42,600.00 |
|
RFP12-08 Energy Solicitation -
Natural Gas Finance-Purchasing |
10/8/07 not later than 12:00 PM | None | None | Awarded to: Santa Buckley $1.102/therm |
|
B11-08 Comprehensive Stormwater
Mitigation & Repair Project
Plans and specifications may be obtained for a non-refundable fee of $40.00 per set, plus a non-refundable shipping & handling fee of $10.00 per set if they are to be mailed. CDD-Engineering |
10/31/07 not later than 2:00 PM | A mandatory pre-bid meeting shall be held at City Council Chambers, 37 Green Street on 10/18/07 at 11:00 AM. | 10% Bid Bond Required | Awarded to: Cape Ann Equipment $293,172.30 |
|
B10-08
Hall Street Wastewater Treatment Plant Grit Facilities Upgrade
General Services Bid documents may be obtained from Purchasing Division City Hall, 41 Green Street, Concord NH 03301 (603) 225-8530 for a non-refundable fee of $80 per set plus a non-refundable fee of $20 to cover postage and handling if they are to be mailed (Partial Sets are not available). |
2/20/08 not later than 2:00pm |
A Mandatory pre-bid informational meeting will be
held at the Hall Street Wastewater Treatment Facility, 125 Hall Street,
Concord NH 03301 on Friday 2/1/08 at 9:00am
|
10% Bid Bond required | Awarded: Penta Corporation Base Bid $823,700.00 plus Bid Alternate 1 $18,000 = Total bid award $841,700 |
|
B09-08 Downtown
City Bus Shelters Structural and Engineering Plan Set CDD - Business Development |
6/13/08 not later than 2:00pm | A Mandatory pre-bid meeting shall be held on 5/20/08 at 10am at the City Hall 2nd Floor Conference Room 41 Green Street Concord NH 03301 603-225-8530 | 10% Bid Bond Required |
Awarded: E. Guimond Construction, Inc. $79,259.30 |
|
B08-08 Ked
Drive Repairs and Improvements
CDD-Engineering |
10/5/07 not later than 2:00pm | A non-mandatory pre-bid meeting shall be held at the intersection of Ked Drive and Josiah Bartlett Road on Sept. 27th at 1:00pm | 5% Bid Bond Required | Awarded to: CSSI $27,670.00 |
|
B07-08 Hall
Street Wastewater Treatment Plant Construction of Control Building Odor
Mitigation Facility
General Services - Wastewater Division |
3/5/08 not later than 2:00pm | A Mandatory pre-bid meeting shall be held 2/14/08 at 9:00am at the Hall Street Wastewater Plant, 125 Hall Street Concord NH 03301 | 10% Bid Bond Required | Awarded: Penta Corporation $1,413,300.00 |
|
B06-08
Timber Sale - Penacook Lake City Forest
Community Development - Planning Division |
9/7/07 not later than 2:00pm | A Mandatory pre-bid meeting shall be held at 8:00am on 8/22/07. Bidders will meet at McDonalds Restaurant, 111 Fisherville Road, Concord NH 03301. | $500 Bid Deposit is required. | Awarded: Hancock Lumber Inc. $41,539.50 |
|
B05-08
Sidewalk Connections for Fisherville Road, Manor Road, Abbott Road and
Borough Road
Community Dev. - Engineering Div. Plans and Specifications may be obtained for a non-refundable fee of $10.00 per set plus a non-refundable shipping handling fee of $5.00 per set if they are to be mailed. |
10/12/07 not later than 2:00pm | A Mandatory pre-bid meeting shall be held on September 18, 2007 at the City Hall - 2nd Floor Conference Room, 41 Green Street, Concord NH 03301 at 10:00am. | 10% Bid Bond Required |
All Bids Rejected: This Bid is being re-bid under B43-08.
|
|
RFP04-08
Granulated Carbon Activated Water Treatment Plant |
8/30/07 not later than 2:00pm |
A Non-Mandatory Pre-proposal meeting shall be
held on 8/16/07 at 10:00am at the Water Treatment Plant 53 Hutchins
Street, Concord NH 03301 No proposers attended the non-mandatory pre-proposal meeting. |
If proposal is over $25,000 a 5% proposal bond is required | Awarded: Calgon Carbon Corporation -$26,391.00 |
|
RFP02-08 Heritage Trail
Signage Development Department - Engineering Services Division |
8/16/07 not later than 2:00pm | None | None | Awarded: Advantage Signs Inc. - Concord NH $16,089.00 |
|
B01-08
2008 Sanitary Sewer Trenchless lining Project
Plans and Specifications may be obtained from the Purchasing Division, City Hall, 41 Green Street, Concord NH 03301 (603) 225-8530 for a non-refundable fee of $35.00 plus a $10.00 non-refundable shipping and handling fee if they are to be mailed. Community Development Department - Engineering Services |
8/17/07 not later than 2:00pm |
A Mandatory pre-bid informational
meeting shall be held at 11:00am on August 3rd 2007 at the City of
Concord, City Hall Annex, 2nd Floor, City Council Chambers, 37 Green
Street, Concord NH 03301. Addendum 1 issued 8/7/07 - includes attendee roster |
10% Bid Bond Required | Awarded: Reynolds In-Liner, $118,615.99 |
FY2008\B39-08 Bid Response Review.xls
|